+1 (978) 955-4300 · [email protected] EN · Fleet RFQ desk
Project contact desk

Give Locus Robotics the fleet boundary conditions first

A useful AMR conversation begins with payload, aisle class, peak window and interface ownership. Send what is known; open items can be recorded rather than guessed.

Locus Robotics project desk and warehouse location illustration
Project address

Wilmington, Massachusetts

Meeting and site-visit details are confirmed by appointment. Include the project country and facility time zone so coverage can be routed correctly.

Email and phone

[email protected]

Use the inquiry form for the initial data set. Telephone contact is provided in the project acknowledgment when a responsible engineer is assigned. Desk line: +1 (978) 955-4300.

Working window

Monday–Friday

08:00–17:00 Eastern Time for project coordination. Emergency or after-hours support applies only where a written Uptime Plan defines the response boundary.

Prepare the review

What helps an application engineer respond

The form can carry an early-stage question, but fleet selection becomes more precise when supporting files describe the physical load and the operating pattern. Do not send personally sensitive warehouse employee data.

Payload schedule

Cart or tote dimensions, maximum mass, center of gravity and known quality variation.

Inventory and flow

SKU count, velocity bands, order-line peaks, replenishment overlap and associate density.

Facility record

Aisle widths, floor condition, charging power, network coverage, crossings and expansion space.

Interface boundary

WMS/WCS/PLC/FMS ownership, data exchange expectations and the proposed FAT/SAT acceptance path.

Data note: Initial capacity and rate discussions remain conditional until the input record and test conditions are agreed. Certification marks are not claimed for a product without model-specific evidence. For brownfield work, identify zones that cannot stop, permitted installation windows and the fallback picking method available during cutover.

If the first message only contains a target robot count, the reply will ask for the missing operating boundary before any sizing discussion continues. Incomplete data is preferred over invented values, because an early false assumption can distort aisle congestion, charging dwell and SAT scenario selection for weeks.

Send an AMR project brief

Files and confidentiality arrangements can be coordinated after the initial acknowledgment. Mention whether the site is greenfield or brownfield and which shifts must remain active during commissioning.